NoteThis page provides links to a number of externally hosted documents, or to documents being delivered by third parties to the NM RAD Team. As a result, whilst the NM RAD Team will endeavour to maintain the integrity of the links or documents, the NM RAD Team cannot be held responsible in the case of differing versions. |
Published Date | Effective Date | Description | |
07/06/2024 |
11/07/2024 |
UK - Standing Agreed Levels - Effective 11/07/2024 | |
02/08/2024 |
05/09/2024 |
UK - Standing Agreed Levels - Effective 05/09/2024 | 30/08/2024 |
03/10/2024 |
UK - Standing Agreed Levels - Effective 03/10/2024 | see LK website |
see LK website |
LK Flight Profiles |
FRA
LS FRA
LSAS Skyguide FRA connections Effective 05 SEP 2024 | |
YOYO and SHARP TURNS
MUAC AIRAC BRIEF
SECTOR DATA
The Sector Data presented below is for those States/FABS/ANSPs which in accordance with RAD General Description, have RAD restrictions based on specific ACC/UAC sector/s in their Appendixes or Annexes. The aim is to allow access to this Sector Data to all the Operational Stakeholders.
|
For additional information see also EUROCONTROL Regional Charts (ERC). The ERCs are a combination of the former Airspace and Flow Management Planning Charts and are available in 13 areas over Europe in the Upper and Lower Airspace. These 13 ERC charts are based on EAD data. Please check regularly for chart updates on:
https://www.eurocontrol.int/service/cartography
GATE DATA
For ATFCM purposes of better capturing the traffic in the FRA, specific airspace volume may be defined and used in the RAD.
|
ERNIP RAD Documentation
Framework Document
https://www.eurocontrol.int/publication/european-route-network-improvement-plan-ernip
Part 1
https://www.eurocontrol.int/publication/european-route-network-improvement-plan-ernip-part-1
Part 2
https://www.eurocontrol.int/publication/european-route-network-improvement-plan-ernip-part-2
Part 3
https://www.eurocontrol.int/publication/european-route-network-improvement-plan-ernip-part-3
Part 4
https://www.eurocontrol.int/publication/european-route-network-improvement-plan-ernip-part-4
RAD DEFINITION OF TERMS
NM Flight Planning Requirements - Guidelines:
https://www.eurocontrol.int/publication/nm-flight-planning-requirements-guidelines
NM RAD Team
Email: nm.rad@eurocontrol.int